During 2021 Volante International successfully supported Hitachi Zosen Inova in Zurich with the process design and authority approval for the building permit of their first 2MW hydrogen production plant in Switzerland. A lot of different entities like the Swiss Gas Authorities (SVGW), Insurances (AGV), Authority for Work and Economy (AWA), High Pressure Inspectorate (SVTI) needed to be coordinated to finalize the building permit, the whole process took about 1 year.
Congratulation to Hitachi for the „go-ahead“!